Features & Amenities

Interior

  • Total Bedrooms

    5

  • Bathrooms

    3

  • 1/2 Bathrooms

    1

  • Above Grade Finished Area

    3488.0

  • Basement YN

    YES

  • Cooling YN

    YES

  • Cooling

    Central Air, Electric

  • Fireplace YN

    YES

  • Heating YN

    YES

  • Heating

    Central, Electric, Heat Pump

  • Main Level Bedrooms

    2

  • Pet friendly

    N/A

Exterior

  • Garage

    Yes

  • Garage spaces

    3

  • Construction Materials

    Brick, Vinyl Siding

  • Parking

    Garage Door Opener, Garage, Driveway, Covered, Inside Entrance, Attached, Detached

  • Pool

    Yes

  • Pool Features

    None

  • Waterfront YN

    NO

Area & Lot

  • Lot Size(acres)

    2.36

  • Property Type

    Residential

  • Property Sub Type

    Single Family Residence

  • Architectural Style

    Colonial

Price

  • Sales Price

    $850,000

  • Tax Amount

    6957.0

  • Sq. Footage

    3, 488

  • Price/SqFt

    $243

HOA

  • Association

    No

School District

  • Elementary School

    N/A

  • Middle School

    N/A

  • High School

    N/A

Property Features

  • Accessibility Features

    Accessible Full Bath

  • Foundation Details

    Permanent

  • Senior Community YN

    NO

  • Sewer

    Septic Tank

  • Tax Lot

    60

  • Water Source

    Well

Schedule a Showing

Showing scheduled successfully.

<
>
IN PERSON
VIA CHAT

What is 3 + 4 ?


Change time

Mortgage calculator

Estimate your monthly mortgage payment, including the principal and interest, property taxes, and HOA. Adjust the values to generate a more accurate rate.

Your payment

Principal and Interest:

$

Property taxes:

$

HOA fees:

$

Total loan payment:

$

Total interest amount:

$

Location

County

ANNE ARUNDEL

Elementary School

Middle School

High School

Listing Courtesy of Brittany Litel , Corner House Realty

RealHub Information is provided exclusively for consumers' personal, non-commercial use, and it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. All information deemed reliable but not guaranteed and should be independently verified. All properties are subject to prior sale, change or withdrawal. RealHub website owner shall not be responsible for any typographical errors, misinformation, misprints and shall be held totally harmless.

Agent ChristyIssler

Broker | Owner

ChristyIssler

Call Christy today to schedule a private showing.


* Listings on this website come from the FMLS IDX Compilation and may be held by brokerage firms other than the owner of this website. The listing brokerage is identified in any listing details. Information is deemed reliable but is not guaranteed. If you believe any FMLS listing contains material that infringes your copyrighted work please click here to review our DMCA policy and learn how to submit a takedown request.© 2024 FMLS.
Welcome to this meticulously maintained property nestled on 2.34 private acres in the highly desirable Chasewood Run community of Pasadena, MD. This unique home offers a rare combination of privacy, space, and flexibility—perfect for multi-generational living or rental income potential.

The main home features 3 spacious bedrooms, 2.5 bathrooms, and a welcoming great room that sets the tone with its vaulted ceilings and natural light. The formal living and dining rooms provide elegant spaces for entertaining, while the updated kitchen flows seamlessly into the heart of the home.

Attached to the main house is a private apartment suite, complete with 2 bedrooms, 1 full bath, a full kitchen, living room, and a separate private entrance—ideal for extended family, guests, or additional income.

Outdoors, enjoy the peace and seclusion offered by the tree-lined lot, while still having room for all your hobbies and storage needs. A two-car attached garage is complemented by an additional one-car detached garage in the backyard—perfect for a workshop, studio, or extra storage.

Brand new Septic and Drain fields 2018

This one-of-a-kind property combines comfort, function, and privacy, all within close proximity to shopping, dining, marinas, and commuter routes.

Don’t miss your chance to own this private retreat in one of Pasadena’s most sought-after neighborhoods!

9188 FIREFLY RUN

Message successfully sent.

What would you like to know?

What is 3 + 4 ?

Related Properties

Welcome home to this charming home in an idyllic setting; a nature lover's paradise on just over an acre of land that abuts Hines Pond; one of largest lots in the neighborhood*Remodeled in 2014, it's a great year-round home or vacation home not more than 60 mins. from Baltimore and not more than 90 mins. from Washington, DC; not too far from Ft. Meade or the Naval Academy either*One-level living inside and out is what so many want today*Open floor plan with remodeled baths and kitchen including stainless appliances, granite counters, and an island large enough for bar seating*Huge primary bedroom with built-in king-size bed and headboard plus built-in entertainment center; walk-in closet; double-sink vanity in ensuite primary bath*Long driveway, garage, carport, and extra parking are perfect for multiple vehicles, family and friends*Bonus "she shed" with electricity!*Magical sunsets from the edge of the pond*1/2 block to private, community beach and tot lot*About 10 min. drive to Ft. Smallwood Park; a little longer to Crosspointe golf and several marinas*Extra bonus is delicious food from local restaurants*Lots of photos because of this amazing home and location!*Please note:  water frontage is estimated and Venice on the Bay is a civic association.
#MDAA2119618

PASADENA

7654 BAY STREET

3 Beds

2 Baths

1,950 Sq.Ft.

$750,000

MLS#: MDAA2119618

PASADENA - CHESAPEAKE SCHOOL DISTRICT    COMPLETION DATE  FEBRUARY 2026

JAMES RIVER MODEL.  4 BEDROOMS. 2,5 BATHS, OVERSIZED FAMILY ROOM, KITCHEN FEATURES 10' ISLAND, BUILDER INCLUDES MANY UPGRADES IN LIST PRICE OF $699900:  STONE FIREPLACE, ALL KITCHEN APPLIANCES STAINLESS STEEL,  SOFT CLOSE CANINETS & QUARTZ OR GRANITE, TILE BATHROOMS, PRIMARY BEDROOM AND BATH WITH WALK IN CLOSET.  UNFINISHED BASEMENT HAS ROUGH IN FOR FULL BATH.  LUXURY VINYL PLANKING ON MAIN LEVEL, UPGRADED CARPET IN UPPER LEVEL..  

STILL TIME FOR BUYERS TO PICK OUT ALL OF THEIR FINISHES!!  CALL LISTING AGENT FOR UPDATE ON CONSTRUCTION SCHEDULE.
#MDAA2130934

PASADENA

13 LUKE DRIVE

4 Beds

2 Baths

2,103 Sq.Ft.

$699,900

MLS#: MDAA2130934

Ameri-Star Homes is pleased to offer this incredible opportunity for a to-be-built, craftsman-style home situated on a beautiful 15,000 square foot lot in the established water-oriented community of Sylvan View on Magothy in Anne Arundel County. Our exciting Sussex J model, featuring an English Basement, 4 bedrooms, 2 and half baths and a 2 car garage, is appointed with an abundance of features that you deserve including, 9-foot ceilings on the main level, engineered hardwood floors on the entire first floor, granite or quartz countertops, upgraded cabinets with soft close doors and drawers, ceramic-clad baths and laundry room, stainless appliances, washer and dryer package, stone accents on the exterior, architectural roof shingles, upgraded craftsman style moldings, craftsman newel posts with iron balusters, a sodded lawn and generous landscaping package and so much more. ALL STANDARD! A home that you certainly will be proud to drive up to. There is 2,232 square feet of above grade living space to enjoy and plenty of room for expansion including adding an optional finished rec room, an optional basement bedroom and optional full bathroom in the basement at an additional cost. Come home and enjoy the lifestyle that the Sylvan View community offers including a waterfront beach area, marina, boat slips for smaller boats, boat ramp, canoe / kayak storage, picnic area, playground area and volleyball court all with some stunning views of the of the river. This location is a convenient commute to Baltimore, Annapolis and Washington DC. This is a rare opportunity for new construction in this community. The images illustrated in this listing may be representative of the builder’s work in likeness and quality and may show optional features available. Prices, terms, conditions, and availability are subject to change without prior written notice.
#MDAA2127514

PASADENA

515 SYLVIEW DRIVE - SUSSEX K MODEL

4 Beds

2 Baths

2,245 Sq.Ft.

$739,990

MLS#: MDAA2127514

Welcome to your waterfront haven along Stoney Creek! This beautiful property offers an ideal blend of comfort and outdoor living. Nestled along the serene shoreline, this home features private water access with a two-tiered pier equipped with a new boat lift yet to be used, making it ideal for boating enthusiasts or anyone who loves spending time on the water. The back yard slopes down from an upper level deck with wide water views and covered patio perfect for grilling, down along a well-groomed landscape with gardens and a shed, to a sandy beach shore and fire pit. Enjoy evenings soaking in your private hot tub with panoramic views of the water, host gatherings on the expansive decks, or dock your boat at your own pier and cruise along the creek.

Inside, you'll find a beautifully-maintained residence with spacious living areas and an effortless flow between indoor and outdoor spaces. The main floor has been updated in recent years and well cared for. Additional highlights include a detached garage with ample storage, a French drain with a lifetime guarantee in the basement, renovated bathrooms, modern finishes throughout, and the peaceful ambiance of waterfront living— a short drive from BWI and Baltimore. 

Whether you're looking for a full-time residence, vacation home, or an investment property, this rare find offers it all. Schedule your showing today and experience the epitome of Maryland waterfront living.
#MDAA2112176

PASADENA

7758 LYMAN AVENUE

3 Beds

3 Baths

1,950 Sq.Ft.

$685,000

MLS#: MDAA2112176

PRICE ADJUSTED: Experience waterfront living at its finest in this exquisite, almost new home in the convenient Bar Harbor community. Designed for comfort, style, and effortless entertaining, this residence showcases Rock Creek water views and thoughtful craftsmanship throughout. The private pier offers two boat lifts and quick access to the Chesapeake Bay.
Inside, a light-filled open layout welcomes you with wood flooring and a two-story great room that is flooded with light. Enjoy sitting by the gas fireplace in colder months or gather with friends on the spacious Trex deck with built-in grill against the scenic backdrop. The gourmet kitchen serves as the heart of the home — complete with a generous island perfect for casual dining or hosting gatherings. There’s so much flexibility in the use of space! There is a main level office that could serve as a formal dining room or bedroom, with a full bathroom around the corner.
On the second floor, there are two ample bedrooms that share a hall bath, and a third bedroom that has an ensuite bathroom. The top-level primary suite is a true retreat, featuring a spa-inspired bathroom, wet bar, two walk-in closets and laundry. The bedroom is large enough to have a sitting area. It opens onto the covered porch to take in panoramic water views or unwind with an evening movie under the stars. The lower-level rec room is another alternative entertaining area. An oversized shed next to the parking area provides a lot of storage for boat gear and outdoor toys.
With its blend of sophistication, comfort, and coastal charm, this contemporary waterfront residence offers the perfect escape for those who love life on the water and want to enjoy a crisp, modern aesthetic.
#MDAA2128944

PASADENA

34 JOHNSON ROAD

4 Beds

4 Baths

3,666 Sq.Ft.

$995,000

MLS#: MDAA2128944

Ameri-Star Homes proudly presents an exceptional opportunity to build your dream home — a stunning Craftsman-style luxury residence situated on a spectacular two-acre homesite in a water-oriented community in Pasadena, Maryland, near Gibson Island. The Baltimore Model offers four bedrooms, two and a half bathrooms, and a side-entry two-car garage, beautifully designed with timeless curb appeal. The upgraded exterior features stone accents, a welcoming portico porch, decorative shakes in the gables, twelve-inch front and side overhangs, architectural-grade roof shingles, a sodded lawn, and a generous landscaping package—all included as standard features. This home also includes an English basement, providing additional flexibility and storage. Inside, the Baltimore Model impresses with a beautifully designed layout that blends luxury and comfort. The two-story family room floods the home with natural light, while the center hall foyer opens to a formal living room, formal dining room, and a private rear study—perfect for today’s lifestyle. The oversized gourmet kitchen is the heart of the home, offering a spacious island, abundant cabinetry, and a seamless flow that makes entertaining effortless. Upstairs, the open hallway overlooks the family room and leads to a convenient upper-level laundry room. The expansive owner’s suite serves as a private retreat, featuring a spa-inspired bathroom with a frameless glass shower, ceramic tile floors and walls, a soaking tub, and a dual vanity. Every detail of this home reflects quality craftsmanship and thoughtful design, with standard features that include sparkling granite or quartz countertops in the kitchen, quartz vanity tops in the primary and hall bathrooms, and engineered hardwood flooring throughout the main level and upper hallways. The chef-inspired kitchen showcases Samsung stainless steel appliances, including a chimney-style hood vented to the exterior, a five-burner cooktop, a double wall oven, an Energy Star–rated dishwasher, and a French door refrigerator. Upgraded soft-close cabinetry, a deep-bowl stainless steel sink, and ceramic tile flooring in all bathrooms and the laundry room add to the home’s sophisticated appeal. Elegant Craftsman-style finishes are found throughout, including five-and-a-half-inch baseboard moldings, cased windows and openings, five-inch newel posts, and oak rails with black iron balusters—all standard in this exceptional home. For those seeking additional space or customization, a three-car garage option and other model variations are available. This is truly a home that you will be proud to call your own. Builder is offering Pre-Construction Pricing and $20,000 in Flex Dollars, which may be applied toward closing costs, options, or financing —making now the perfect time to build your dream home. Perfectly located near Gibson Island and within an easy commute to historic Annapolis, Baltimore, and Washington, D.C., this community offers both tranquility and convenience. Note: Photos and the 3-D tour shown in this listing are of a similar Baltimore Model and will display optional features. Prices, terms, conditions, and availability are subject to change without prior written notice.
#MDAA2127960

PASADENA

1807 MOUNTAIN BAY ROAD - BALTIMORE MODEL

4 Beds

2 Baths

2,847 Sq.Ft.

$989,990

MLS#: MDAA2127960

Open House: Saturday 12/13 & Sunday 12/14 from 12pm-2pm
MUST SEE !! Amazingly views of the Patapsco River and Chesapeake Bay.  Recently renovated close to $100,000 for this 3 bedrooms and 1.5 baths. As you enter, you'll be greeted with marble floorings throughout, vaulted ceiling and bay window. Spacious kitchen with stainless steel appliances, fireplace in dining room, HVAC 2023, entire heating is natural gas and not oil tank. Sunroom filled with natural lights and numerous glass windows. Boat lift and 3 jet-ski lift have been installed. Private pier, great for fishing, jet-skiing, boating and many water activities.
#MDAA2132122

PASADENA

2032 KURTZ AVENUE

3 Beds

1 Baths

1,342 Sq.Ft.

$759,999

MLS#: MDAA2132122

Charming 3 bedroom Bodkin Creek deep waterfront with stellar panoramic water-views, mature shade trees and steady bay breezes. Located in the spectacular, peninsula community of Poplar Ridge, is this charming and spacious 4 level home with an attached one-car garage, ready for your vision. The home's bluff-top elevation shaded by majestic oaks and perched approximately 15 feet above the shoreline provides an absolutely gorgeous waterfront setting with panoramic views of Back Creek of the Bodkin. Enter into the large living room with wood-burning fireplace. The living room and adjacent dining room with built-in cabinetry and hardwood floors both have waterfront views. The upper level has 3 bedrooms also with hardwood floors, 1 full bath. The slightly lower ground floor level has a finished family room that could serve as an office, with a street-side entrance door and a half bath and adjacent laundry room that could easily be converted to a 2nd full bath.  Approximately 54 feet of bulkheaded sand-bottom shoreline and a private pier with typical 7'+ depth and mooring pilings framing a deep draft big boat slip. This lot and home are primely positioned to take advantage of one of the best boating destinations the east coast has to offer! Located within minutes of the mouth of the Bodkin and the Chesapeake Bay. In just 30-45 minutes, boat to Annapolis, Rock Hall, the Magothy River, Kent Island and Baltimore! Or stay close to home and anchor to enjoy the sunrises and sunsets in the grand basin of the Bodkin, where Main Creek and Back Creek converge. Don't miss this tremendous opportunity to live the Maryland waterfront lifestyle. As-is sale.
#MDAA2118390

PASADENA

1930 CEDAR ROAD

3 Beds

1 Baths

1,656 Sq.Ft.

$725,000

MLS#: MDAA2118390

Ameri-Star Homes proudly presents an exceptional opportunity to build your dream home—a stunning Craftsman-style luxury residence on a spectacular two-acre homesite in a water-oriented community in Pasadena, Maryland, near Gibson Island. The Jefferson Model features a desirable first-floor primary bedroom and bathroom, offering a total of four bedrooms, three-and-a-half bathrooms, and a side-entry two-car garage. Its timeless exterior includes stone accents, a welcoming portico porch, decorative gable shakes, touches of vertical siding, twelve-inch overhangs on the front and sides, architectural-grade roof shingles, a sodded lawn, and a generous landscaping package—all included as standard features. An English basement provides additional space, flexibility, and storage. Inside, the Jefferson impresses with a thoughtfully designed layout that blends luxury, comfort, and functionality. The two-story family room fills the home with natural light, while the center hall foyer opens to a formal living room, formal dining room, and the first-floor primary suite. This expansive owner’s retreat offers a spa-inspired bath with a frameless glass shower, ceramic tile floors and walls, a soaking tub, and a dual vanity—perfect for today’s lifestyle. The gourmet kitchen serves as the heart of the home, featuring a spacious island, abundant cabinetry, and a seamless flow that makes everyday living and entertaining effortless. Upstairs, an open hallway overlooks the family room and leads to three secondary bedrooms and two full baths, each with buddy-bath configurations. Every detail showcases quality craftsmanship, including standard features like sparkling granite or quartz kitchen countertops, quartz vanity tops in the primary and hall bathrooms, and engineered hardwood flooring throughout the main level and upper hall. The chef-inspired kitchen includes Samsung stainless steel appliances—a chimney-style hood vented to the exterior, five-burner cooktop, double wall oven, Energy Star–rated dishwasher, and French door refrigerator. Additional upgrades such as soft-close cabinetry, a deep-bowl stainless steel sink, and ceramic tile in all bathrooms and the laundry room further elevate the home’s appeal. Craftsman-style finishes throughout include five-and-a-half-inch baseboards, cased windows and openings, five-inch newel posts, and oak rails with black iron balusters. For added flexibility, a three-car garage and other models and variations are available. Ameri-Star Homes is offering Pre-Construction Pricing and $20,000 in Flex Dollars, which may be applied toward closing costs, options, or financing—making now the perfect time to build your dream home. Incentives are available only with the use of the builder’s approved lender and title company. Ideally located near Gibson Island and within easy reach of Annapolis, Baltimore, and Washington, D.C., this community offers both convenience and tranquility. Photos and the 3-D tour shown are of a similar Jefferson Model and may feature optional upgrades. Prices, terms, conditions, and availability are subject to change without prior written notice.
#MDAA2131644

PASADENA

5084 MOUNTAIN ROAD - JEFFERSON MODEL

4 Beds

3 Baths

2,695 Sq.Ft.

$979,990

MLS#: MDAA2131644

 - property

Send a message

Message successfully sent.

Your message

What is 3 + 4 ?

Reason for contacting?

Sign Out

Virtual Assistant

Would you like to take the next step with this property? We can help you schedule a showing or virtual tour, or send you more details.

Yes, I would like more information.

Thank You for Your Reply, One of Our Agents will contact you as soon as possible

No, maybe later.

Thank you, you can always contact me via email, phone number or through the contact form.

Realhub AI

Lucy - Your AI-Powered Realtor

Update Your Temporary Password

Personalize your search

Enter your email and we'll notify you immediately when new listings match what you're looking for.

or enter email address

Already have an account ? Login here

Continue your home search

Already have an account ? Login here

We use cookies

We use cookies primarily for analytics to enhance your experience. By accepting, you agree to our use of these cookies. You can manage your preferences or learn more about our cookies policy.